Skip to content
🚚 Fast UK Delivery Options | ⚡ Express Delivery Available | 📦 Bulk Orders Welcome
🚚 Fast UK Delivery | ⚡ Express Available | 📦 Bulk Orders
Planting a dormant bare-root hedge whip in workable soil

Bare-Root Hedging: Prepare the Site Before the Bundle Arrives

Bare-root hedging arrives without a pot of compost protecting each root system. That makes the time between delivery and planting important. Before ordering a bundle, decide where it will grow, how much room the mature hedge needs and what you will do if November's soil is too wet to work.

Choose the hedge for its position

Check the eventual height, width and suitability of the proposed species for your soil and exposure. Think about access to both sides for future maintenance, nearby paths and the space between the hedge and a boundary. A young row looks narrow; its mature footprint is the one to plan around.

A mixed wildlife hedge can provide flowers, fruit and shelter, but select the species to suit the garden rather than using a mixture purely because it is labelled native. Ask the nursery for its recommended spacing and establishment guidance for the actual plants supplied.

Prepare the line while the ground is workable

Mark the row and remove competing perennial weeds from the planting strip. Check for buried services before digging. Have the layout agreed before delivery so roots are not left exposed while you decide where the last section should go.

Plant dormant bare-root hedging during the appropriate autumn-to-winter planting period. Delay if the soil is frozen or waterlogged. A date on the calendar cannot compensate for ground that cannot be worked without smearing and compaction.

Set out tools and a source of water in advance. Our digging tools and shovels are worth comparing if your existing tool is unsuitable for the soil or awkward to use. Measure the line before calculating plant numbers; spacing differs with species, plant vigour and whether the design uses one or two rows.

Keep roots protected from arrival onwards

Open the delivery promptly and inspect it against the order. Plant as soon as conditions allow, keeping roots moist and protected while you work through the bundle. Do not spread the whole delivery out on a windy day and leave the last plants waiting with uncovered roots.

If planting is delayed, follow the nursery's temporary-storage advice. RHS guidance includes keeping roots covered with moist material in a frost-free shed or temporarily heeling plants into suitable soil. Neither option means leaving the package unopened for weeks. Make a note to inspect the roots and arrange the eventual planting.

Plant roots at a sensible level

Spread bare roots naturally in a hole large enough to accommodate them. Avoid folding a long root system into a narrow slot. Plant at the appropriate existing soil level, covering the roots rather than burying the stem deeply. Backfill and firm gently, then water to settle the soil.

There is no need to create a rich pocket of fertiliser or organic material at the bottom of each hole. Check species-specific advice before any initial cutting back; the same pruning treatment does not suit every hedging plant.

Plan beyond planting day

Record the species and layout, and put checks into your routine for competition from weeds, drying soil and loosened plants. New hedges need attention through their establishment period, including watering in dry spring and summer weather. Winter planting starts the project; it does not remove next year's aftercare.

Sources and further reading

Previous article Single or Twin-Wheel Wheelbarrow? Choosing for Your Garden and Yard
Next article Dividing Perennials in Autumn: Check the Plant and Soil First